HOME

CONSTRUCTION ARTICLE

 
 HOME / CONSTRUCTION ARTICLES / renovation in general
.

home renovation CONSTRUCTION ARTICLE                        

renovation in general

                     

INTRODUCTION

All buildings has each building life. Hot and transformation climate coldness of noon and night, everyday usage and operation makes housing to have contraction of quality. Added with man behaviour who is never satisfied makes renovation of housing. Many considerations that is often done before building housing like the wide of which will be built, building material selected , allocation and allotment of space, selection of colour pattern, because in new housing, people usually planning as perfect and  detailed possibly.
However, Even doing calculation and planning perfectly when building housing. Over a period of time generally the owner  does renovation in small scale and also in total, if housing occupied unmatched to appetite and requirement of the owner, it requires renovation.

Some reasons why renovation must be done.

1. When the house/ material has old/ less nyaman/broke and wish to be changed.

2. When  the owner wishing housing interior matching with his desire.

3. When requirement of attachment space would urgent / have arranged  the room /want new interior

4. When there is fund to renovate.
 

Image1 : house renovation

RENOVATION TYPES

Home renovation construction requires matured planning. Improper renovation will yield disappointment. The cause can many kinds of like workers that is less expert, election of material which less careful, planning that is less matured, etc.

There are some pace needed for renovation

1. Investigate the structural strengh of the old building .

2. Planning the renovation (purpose , cost, time, work volume, drawing planning, material, worker )

Based on work and cost, renovation earns we to group to become 3 batch. this grouping is important important for you, because a refinement work and retouching of a housing has varying work item.
 

Image2 : install ceramic


1. Light renovation

Changes paint, ceramics danced, improve, repairs installation of water and electricity  Generally workmanship time of this renovation is having scale this is light between 1 - 7 day

2. Medium renovation

Changes housing fence, seen face, adds platform. renovation of Space tamu,kamar sleep, bathroom, danced. Generally workmanship time of this renovation having scale this light between 7 - 30 days

3. Total renovation

Changes total room site, roof. addition of Floor, reaming of a room. Generally workmanship time of this renovation having scale this light until months.

 

 

COPYRIGHT @L2BUILD.COM 2008 ALL RIGHTS RESERVED.

 

 

.